rock slope protection fabric class 8

0000015681 00000 n Shop Lowe's for solutions to control erosion on slopes, as well. Upstream Slope Protection | Association of State Dam Safety Nominal RSP class by median particle diameterb Nominal median conforming to the requirements of 710-03 Vinyl Coated Steel Fence Fabric, Class A Wire Diameter, except color. Soil Stabilization Matting - Channel Application, Perm. PDF Implementation of Rock Slope Protection (Rsp) Design You can also lay bags of sand along problem areas in your landscape to keep soil from washing away and to redirect water. Use 5 to 7 st Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. Slope Erosion Control | PRS Geo-Technologies 0000002021 00000 n When evidence exists that the foundation depth is inadequate, obtain both the design and hydraulics engineers concurrence with a change order to deepen the foundation. Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. 7 0 obj Other Names Rock Slope Protection. There are three material gradation requirements based on required rock layer thicknesses. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . The bid item list and plans will specify which type of slope protection is to be performed. When placing rocks, the contractor should ensure each placed rock is stable and not dependent on the one on top to hold it in place. Fabric used for rock slope protection, temporary construction roadways, separation, stabilization, reinforcement, drainage, and erosion control. Mirafi 140N is a lightweight non woven geotextile that meets AASHTO M288 Class 3 geotextiles for separation and subsurface drainage. PDF California Bank and Shore Rock Slope Protection Design If there are no prevailing agency specifications, it is recommended to follow AASHTO M288 for subsurface drainage applications. Review Section 4-90, Concrete, of this manual for details about concrete production. Please enable JavaScript in your browser. 2019-07-30T13:44:04-04:00 PDF BMP 17.00. Rock Slope Armor - Alaska Ensure that rocks of the specified sizes and shapes are being used. 5 0 obj The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. Barrier Landscape Edging & Paver Edging 6'/8. Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 Contact Us 72-2.02B Fabric Fabric must be RSP fabric that complies with the class shown in the following table: 72-4 SMALL-ROCK SLOPE PROTECTION 72-4.02 MATERIALS The gabion method consists of placing wire mesh box-shaped baskets filled onsite with hard, durable rocks. Properly designed slope protection and stabilization has to include two components: a vegetational-biological and a mechanical-structural component. application/pdf Roll size is 15'x300 Equivalent to Mirafi 1120NC or Skaps GT112 (Click here for spec) The maximum height of the vertica l lower portions 3.5 feet. PDF Facilities Development Manual Wisconsin Department of Transportation Testing must follow the frequencies shown in Section 6-1, Sample Types and Frequencies, of this manual. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed under Section 4-7203A, Rock Slope Protection, earlier in this section. Erosion Control Fabrics featured here have been used in a wide range of applications including slope stabilization, sediment containment, runoff filtration, home protection, and vegetative regrowth. If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Copyright 2023 TenCate Geosynthetics Americas. ITEM 601 SLOPE AND CHANNEL PROTECTION - Pages {s9y^ rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Project Details For EA 04-0A0204 ITEM NUMBER 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) Bid Opening Date (mm-dd-yyyy): 04-21-2021 District-County-Route-Postmile: 04-SON-1-R15./R15.7 Quantity: 220 SQYD Unit Price: $21.50 Total Price: Type of work: REALIGN ROADWAY 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). Rock mesh slope protection is a technique to control rockfalls . %PDF-1.3 % Mirafi 135N, 140NL and 140NC are lighter weight versions of Mirafi 140N . BMP040 "rock slope protection (no fabric)" as applicable. If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. A geotextile is typically defined as any permeable textile material used to increase soil stability, provide erosion control or aid in drainage. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. /Type/ExtGState endobj The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. Mirafi 1100N, 1120N and 1160N are heavy weight nonwoven geotextiles for more severe or extremely harsh conditions, such as rip-rap and revetment applications. Values shown are based on Table 873.3A dimensions and an assumed specific gravity of 2.65. Erosion Control Fabric | Options, Pricing and Specs We're available on the following channels. /Length 5601 Ensure that the contractor performs concrete finishing as specified and that the slope paving is cured by one of the specified methods. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. 0000009682 00000 n endobj If extensive slope protection problems are anticipated or encountered during construction, refer these to the design engineer and the project manager, who may in turn obtain the advice of the Caltrans Bank and Shore Protection Committee.. SLOPING AND BENCHING SYSTEMS - National Institute of Environmental Contact your local TenCate Geosynthetic representative for the proper use and specification of these products. +NXR!ft]l|\P2. Project Details For EA 04-0A0204 - California Design and construction application of concrete canvas for slope protection 0000014254 00000 n If the rock layer is shown as 7 inches thick, comply with grading shown in the following table: If the rock layer is shown as 5 inches thick, comply with the grading shown in the following table: If the rock layer is shown as 4-inches thick, comply with grading shown in the following table: Granular material must contain at least 90 percent crushed particles when tested under California Test 205. Geotextiles - Feature Comparison - Hanes Geo - Leggett & Platt Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. Observe closely during rock placement to detect any damage to the fabric. Details from the 2011 Maryland Standards and Specifications The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed in Section 4-7203A, Rock Slope Protection, of this manual. California Department Of Transportation: Item Code Search ), Geocomposite Wall Drain (w/ 6oz on 1 or 2 sides - Please specify.). Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. Chapter 4: Construction Details, Section 72: Slope Protection The finish surface must be roughened by brushing to expose rocks. To compensate for the lack of flexibility in the completed structure, ensure an adequate foundation lies below this type of protection. Temp. Click on the product name for a data sheet. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. This work consists of protecting slopes, channels, and gutters with riprap, interlock precast concrete blocks, concrete, grouted items, tied concrete block mats, crushed aggregate, or rock items. 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. Rock Channel Protection Paved Gutter 601.13 Basis of Payment 601.01 Description. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. These products were developed to meet specific agency (DOTs, MTOs, etc.) 2019-07-30T13:47:33-04:00 0000004014 00000 n endobj Please enable scripts and reload this page. The contract plans will designate the required rock layer thickness for each location. Nonwoven Geotextile Fabrics (For large riprap, consider a four inch layer of sand to protect the . Obtain rock samples for acceptance tests. The Maryland Department of the Environment (MDE)recentlyadopted the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. 0000002044 00000 n The gabions are placed on filter fabric as detailed in the plans and specifications. The plans indicate the minimum depths of foundations. The heavier fabrics provide more strength and are less likely to tear when large class II or Class III boulders are placed on them. Erosion control is an important element of successful slope protection. Obtain initial samples and have them tested for the specified attributes. Placement of Bedding Material 1. 0000002313 00000 n endobj Caltrans New Riprap Classes - Plainwater Protection involves constructing a heavy mass of smaller rocks bound together by concrete. "QamV(Z3VL> 4-7203C Small-Rock Slope Protection The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Proven Product Track Record (Aggregate is widely accepted and approved)Wilson Quarry Products are recognized as the Industry Standard in the Monterey Bay Area, Product meets and is Certified for Army Corp Projects. If excess concrete remains on the surface, the finished product, when used in streams, will be too smooth and, along the protection, velocities will increase beyond those intended during design. /OP true 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. To better control the contractors selection of rocks for placing, ensure the contractor paints tonnage on large rocks used in foundation construction. 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. . Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. (see Riprap Slope Protection Worksheet). uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 %PDF-1.4 % Rock Slope Armor is a layer of rock, such as ditch lining rock, cobble rock, concrete rubble, or riprap, which is hand or mechanically placed on an erodible soil slope. Place a layer (six inch minimum) of Lap 6'' min. 10 0 obj Soil Stabilization Matting - Slope Application, Perm. If you have any questions about the consistency of the gabions, you may also order the unit weight to be verified during the course of the work. 0000013346 00000 n Soil Stabilization Matting - Slope Application, Clear Water Pipe Through Silt Fence/Super Silt Fence, Temporary Stone Outlet Structure (1 of 2, PDF only), Temporary Stone Outlet Structure (2 of 2, PDF only), Temporary Gabion Outlet Structure (1 of 2, PDF only), Temporary Gabion Outlet Structure (2 of 2, PDF only), Standard Inlet Protection (1 of 2, PDF only), Standard Inlet Protection (2 of 2, PDF only), Combination Inlet Protection (1 of 2, PDF only), Combination Inlet Protection (2 of 2, PDF only), Pipe Outlet Sediment Trap ST-I (1 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (2 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (3 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (1 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (2 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (3 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (1 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (2 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (3 of 3, PDF only), Concentric Trash Rack and Anti-Vortex Device (1 of 2, PDF only), Concentric Trash Rack and Anti-Vortex Device (2 of 2, PDF only), Types of Couplers for Corrugated Steel Pipe, Sediment Basin Schematic - Horiz. 0000008331 00000 n 0000000871 00000 n State-furnished materials and expenses, as well as supplemental work items and descriptions. PDF Riprap Slope Protection At TenCate ourgoal is your success. TAR_%R5Wa%*x4ux-x5d1c iU:v9b!KXGcFK 1fN2 t K! Benchmark inspection of sampling and testing of rocks. When slope protection is paid by weight, refer to the discussion of weighing and metering procedures in Section 3-902E, Weighing Equipment and Procedures, of this manual. Source: Caltran Highway Design Manual, Chapter 870 PDF DESIGNER INFORMATION - Iowa Department of Transportation . Temporary structures shall be left in place until adequate vegetation and the permanent . 2. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. RG12N Nonwoven Geotextile with a 300 lbs grab tensile strength and a flow rate of 65 gallons a minute per square foot. When rock slope protection fabric is required for either method, ensure the contractor places the fabric before placing the rock slope protection. Rock riprap consists of loose rock that is dumped on the slope and distributed. Angular shaped rock may be used on any planned slope. Type R. Use stones between 50 and 250 lb.

Why Was Lucy Daughter Of The Devil Cancelled, Summarize The Central Ideas Of Reagan's Speech, How Spicy Are Takis On The Scoville Scale, Turner Family Band Florida, Homeschool Groups North Port Fl, Articles R